Where you are: Home pageYear 2015Issue (113) → Article:
AAA     ENG | POL

Stohastic Model to Determine the Elements of the Production Cycle Time: Case of Serbian Textile Industry

General problems of the fibre and textile industries

Authors:

Nr DOI: 10.5604/12303666.1161752

Download... PDF
Full text
Download... PDF
references

Abstract:

The paper presents an original method of determining the elements of the production cycle time by using the modified work sampling method applied to a textile factory. It is shown that the movement of the elements of time can be viewed as a process and in the mathematical sense can establish control limits of error of ± 3 SD. The mean time of the production cycle of the groups created by the number of pieces in the series – tpcu moving the hyperbolic function, which has the asymptote c, a function of the form tpcu = c + b/log n, where all groups of the production cycle in the mathematical sense do not act like strata but are function tpcu related to technology and deterministic factors of the production series.

Tags:

production cycle, production cycle time, work sampling, stochastic model, textile industry.

Citation:

Stanisavljev S, Ćoćkalo D, Klarin M, Spasojević Brkić V, Đorđević D. Stohastic Model to Determine the Elements of the Production Cycle Time: Case of Serbian Textile Industry. FIBRES & TEXTILES in Eastern Europe 2015; 23, 5(113): 23-29.

Published in issue no 5 (113) / 2015, pages 23–29.

CONTACT:

FIBRES & TEXTILES
in Eastern Europe
ul. Skłodowskiej-Curie 19/27,
90-570 Łódź, Poland
e-mail: infor@lit.lukasiewicz.gov.pl
ftee@lit.lukasiewicz.gov.pl
Events:

EDITORIAL OFFICE
FIBRES & TEXTILES in Eastern Europe 19/27 M. Skłodowskiej-Curie Str., 90-570 Łódź, Poland e-mail: infor@lit.lukasiewicz.gov.pl; ftee@lit.lukasiewicz.gov.pl

EDITORIAL DEPARTMENT
Editor-in-Chief Dariusz Wawro, Head of Editorial Office Janusz Kazimierczak, Text Editor Geoffrey Large, Assistant Editor Anna WahlProduction Łukasiewicz-ŁIT

facebook